The expansion of manufacturing required additional utility capacity for the site. The system was upgraded focusing on energy efficient design. The overall site steam load was reduced by installing three LPHW Boilers and four CHP units that can generate electricity and low-pressure hot water which will supplement the heating load on site. A new boilerhouse was constructed to house the new units.
